BLANK

 

Drilling Rates

 

Geoprobing:

  PECFA Non-PECFA
Mobilization per day
$275.30
$225.00
Geoprobing per foot
$6.16<24 feet deep
$7.00
Dual tube Wells per foot  
N/A
$11.00
Temporary Wells per foot(1"diameter)
$3.65
$6.00
Expendable Point (each)
$8.35
N/A
Groundwater Tubing per foot
$0.31
$0.31
Decon per day
N/A
$75.00
Borehole Abandonment per foot
$0.60
$50.00
Water Sample Collection (each)
$24.32
$25.00
Concrete Penetration (each)  
$10.44
$20.00
Concrete Coring (each)  
N/A
$50.00
Mini Flush Mount
N/A
$75.00

**PECFA rates are a set price given by the State of Wisconsin Department of Commerce.  Non-PECFA rates are subject to change either up or down depending on job distance, work scope, supply costs, fuel prices, etc...

**All indoor drilling will be billed at an hourly rate, call for pricing.

Hollow Stem Auger Borings and wells:

    PECFA Non-PECFA
Mobilization per day  
$664.78
$450.00
Soil Borings per foot  
$13.15<25 feet deep or $10.33 if blind drilled
$11.00
Well Installation per foot (2" diameter)  
$11.79
$12.00
Decon per day  
N/A(May be seperatley billed)
$75.00
Borehole Abandonment per foot  
$3.55
$3.00
Water Sample Collection (each)  
$24.32
$25.00
Flush Mount (each)  
$131.49
$95.00
Stick-ups/Pro-tops (each)  
$122.42
$95.00
Drums  
N/A(May be seperatley billed)
$45.00
Concrete Penetration  
$43.52
$50.00
Concrete Coring (each)  
N/A
$50.00
Padlocks (each)  
$7.10
$5.00
Per Diem per day  
$125.75
$100.00

**PECFA rates are a set price given by the State of Wisconsin Department of Commerce.  Non-PECFA rates are subject to change either up or down depending on job distance, work scope, supply costs, fuel prices, etc...

**All indoor drilling will be billed at an hourly rate, call for pricing.

 

1402 7th Avenue. Grafton, Wisconsin 53024

Copyright 2006 moraineenvironmental.com. All Rights Reserved.